UPDATE PENGELUARAN PEMBANGUNAN MASJID DAN SANTUNAN ANAK YATIM
1. 30/01/2024 100 sak Semen Conch Rp 6.800.000
2. 30/01/2024 20 staf Besi 10 SNI Rp 1.760.000
3. 30/01/2024 10 staf Besi 6 SNI Rp 400.000
4. 30/01/2024 24 bh Baut 1/2 x 25 cm Rp 288.000
5. 30/01/2024 48 bh Ring 1/2 Rp 72.000
6. 30/01/2024 8 kg Paku 7 cm Rp 200.000
7. 30/01/2024 8 kg Paku 10 cm Rp 200.000
8. 30/01/2024 14 bh Elbow PVC 2" ACC Rp 280.000
9. 30/01/2024 Biaya langsir material Rp 1.100.000
10. 31/01/2024 3 dump truk Pasir halus Rp 3.600.000
11. 02/02/2024 1m² Balok Matan 8x12 Rp 3.500.000
12. 03/02/2024 14 pcs Jendela uk 170x52 plus kaca riben 5ml Rp 6.300.000
13. 07/02/2024 2kg Bendrat Rp 80.000
14. 08/02/2024 8kg Paku Seng Rp 480.000
15. 08/02/2024 1 ball Kawat Bendrat Rp 575.000
16. 08/02/2024 7 staf Pipa Listrik 5/8 Rp 91.000
17. 08/02/2024 15 bh Mangkok Panasonic Rp 112.500
18. 08/02/2024 1 roll Seng plat biru 30 cm Rp 900.000
19. 09/02/2024 1 Rol Seng plat Biru 30 cm Rp 900.000
20. 09/02/2024 2 staf Hollo Galvanis 2x4 Rp 330.000
21. 09/02/2024 1 lembar Terpal biasa 3x4 Rp 90.000
22. 09/02/2024 100 sac semen conch Rp 6.800.000
23. 09/02/2024 7 staf Pipa Listrik 5/8 Rp 91.000
24. 09/02/2024 16 dos paku beton 4" Rp 400.000
25. 09/02/2024 32 lembar GRC 6 mm Rp 3.680.000
26. 09/02/2024 2 roll NYA 1 x 1,25 100 m,merah dan hitam Rp 1.100.000
27. 09/02/2024 5 dos paku GRC Rp 225.000
28. 09/02/2024 2 pail cat nodrop 009 Rp 2.700.000
29. 09/02/2024 4 meter Kawat ram Rp 80.000
30. 09/02/2024 Biaya langsir matrial Rp 440.000
31. 09/02/2024 1 dump truk pasir kasar Rp 1.000.000
32. 10/02/2024 2 Daun Jendela uk 170x52 @ Rp 450.000 = Rp 900.000
33. 10/02/2024 4 Daun Jendela uk 170x31 @ Rp 350.000 = Rp 1.400.000
34. 10/02/2024 BBM utk Operasional (75 Liter x Rp 14.000) = Rp 1.050.000
35. 12/02/2024 10 Roll tali Boplang Rp 150.000
36. 12/02/2024 2 Botol Oli 2T Rp 100.000
37. 17/02/2024 2 bh Kapasitor Daesung 24 mikro Rp 130.000
38. 17/02/2024 13 bh Mata potong Rp 170.000
39. 18/02/2024 100m Tali tambang 6 ml Rp 200.000
40. 18/02/2024 2kg Politur Indian warna Rp 200.000
41. 18/02/2024 1/2kg Cat Avian Rp 55.000
42. 18/02/2024 16 Amplas bulat Rp 48.000
43. 23/02/2024 3kg Paku 7cm Rp 90.000
44. 24/02/2024 16 lbr triplek 5 mm Rp 1.520.000
45. 24/02/2024 16 lbr triplek 9 mm Rp 2.720.000
46. 24/02/2024 3 kg Paku 4 cm Rp 90.000
47. 24/02/2024 3 kg Paku 3 cm Rp 99.000
48. 24/02/2024 10 kg Paku 7 cm Rp 220.000
49. 24/02/2024 10 kg Paku 10 cm 220.000
50. 24/02/2024 1 Dos klem no 17 mm Rp 75.000
51. 24/02/2024 1 roll NYA 1X2,5 50 meter Biru Rp 300.000
52. 24/02/2024 1 pail Nodrop 009 Rp 1.350.000
53. 24/02/2024 Biaya langsir matrial Rp 500.000
54. 25/02/2024 1 karung beras utk motoris Rp 380.000
55. 26/02/2024 2 kubik Pasir Kasar Rp 600.000
56. 26/02/2024 Ops Genset Masjid Rp 400.000
57. 26/02/2024 4 bh Baut 1/2" Rp 40.000
58. 26/02/2024 24 bh Ring Rp 24.000
59. 28/02/2024 5 bh spons acian Rp 125.000
60. 28/02/2024 1 unit amplas Ryu Rp 525.000
61. 28/02/2024 10 m Amplas kasar dan halus Rp 150.000
62. 28/02/2024 5 bh Spika plastik Rp 100.000
63. 28/02/2024 Ops Biaya langsir matrial Rp 600.000
64. 05/03/2024 1 Mata potong keramik Rp 50.000
65. 05/03/2024 1 Mata terminal Rp 20.000
66. 05/03/2024 1 Cok Rp 15.000
67. 06/03/2024 100 Batang bambu besar Rp 1.200.000
68. 06/03/2024 Jasa pembuatan bata 1.540 pcs Rp 1.050.000
69. 06/03/2024 2 kubik Pasir Kasar Rp 600.000
70. 07/03/2024 17 staf Besi 30 ulir Rp 2.720.000
71. 07/03/2024 3 bh pisau tumpul 3" Rp 75.000
72. 07/03/2024 2 bh pisau tumpul 15" Rp 30.000
73. 07/03/2024 1 unit trafo last Daesung 900 Watt Rp 1.250.000
74. 07/03/2024 2,5 kg Kawat last RB 2,6 mm Rp 130.000
75. 07/03/2024 2,5 kg Kawat last RB 3,2 mm Rp 130.000
76. 07/03/2024 1 bh Mata bor beton 12 mm Rp 40.000
77. 07/03/2024 1 bh Suction dent puller Rp 325.000
78. 07/03/2024 1 pasang Sarung tangan las Rp 75.000
79. 07/03/2024 Biaya langsir material Rp 300.000
80. 09/03/2024 83 Dos Granit cream 60 x 60 Top Gress Rp 18.260.000
81. 09/03/2024 Biaya langsir matrial Rp 400.000
82. 13/03/2024 Listrik utk nglas besi 2 MLM Rp 400.000
83. 13/03/2024 MCB listrik Rp 81.000
84. 18/03/2024 30 sak semen conch Rp 1.950.000
85. 18/03/2024 biaya langsir semen Rp 350.000
86. 18/03/2024 2 dump truk pasir halus Rp 2.400.000
87. 18/03/2024 1 rol Tali benang Rp 100.000
88. 19/03/2024 biaya langsir pasir Rp 650.000
89. 21/03/2024 10 dus Granit 60x60 cover London Rp 2.200.000
90. 21/03/2024 40 sak semen conch Rp 2.600.000
91. 21/03/2024 Biaya langsir Rp 350.000
92. 22/03/2024 1 lampu LED in lite 100 Watt Rp 600.000
93. 22/03/2024 4 kg semen nat suka Rp 140.000
94. 22/03/2024 11 pcs MCB 6 A Rp 550.000
95. 22/03/2024 1 pcs MCB 4 A Rp 40.000
96. 22/03/2024 1 pak Batu potong wd 4" Rp 130.000
97. 22/03/2024 20 dus Granit 60x60 cover London Rp 4.400.000
98. 22/03/2024 20 kg cat nodrop 3in1 Rp 2.600.000
99. 22/03/2024 20 kg nodrop Rp 2.550.000
100. 22/03/2024 5 mata potong besi Rp 75.000
101. 22/03/2024 3 kg Paku 5cm Rp 75.000
102. 23/03/2024 2 rol kawat ram halus Rp 900.000
103. 23/03/2024 5.5 MTR kawat ram halus Rp 275.000
104. 23/03/2024 15 m kawat ram halus Rp 900.000
105. 23/03/2024 Biaya langsir semen dan kawat Rp 350.000
106. 24/03/2024 50pcs Besi beton 8 serti Rp 3.750.000
107. 24/03/2024 10 dus Granit 60x60 cover London Rp 2.200.000
108. 24/03/2024 Biaya langsir Besi dan garanit Rp 350.000
109. 25/03/2024 1 roll kawat Bendrat Rp 550.000
110. 25/03/2024 Listrik utk nglas besi 3 malam Rp 600.000
111. 25/03/2024 BBM utk genset Rp 100.000
112. 26/03/2024 KWH listrik 1.200 Rp 2.000.000
113. 26/03/2024 2 dump pasir halus Rp 2.400.000
114. 26/03/2024 Biaya langsir pasir 2 dump Rp 2.000.000
115. 28/03/2024 Kawat ram halus Rp 1.056.000
116. 30/03/2024 4 kubik Pasir halus laut Rp 1.200.000
117. 31/03/2024 10 dus Granit cove London 60x60 Rp 2.200.000
118. 31/03/2024 20 set engsel IGM 3" Rp 500.000
119. 31/03/2024 20 pcs Hak Angin YU Rp 400.000
120. 31/03/2024 20 pcs Grendel Hitam 2" Rp 200.000
121. 31/03/2024 7 pcs Homedeco metalic 02 Rp 1.190.000
122. 31/03/2024 1 pcs kuas cat Tika 5" Rp 45.000
123. 31/03/2024 1 pcs kuas cat home care 2" Rp 12.000
124. 31/03/2024 1 pcs kuas cat home care 2,5" Rp 15.000
125. 31/03/2024 1 pak perata keramik blitz Rp 200.000
126. 31/03/2024 5 pcs baki cat prima Rp 125.000
127. 31/03/2024 5 pcs kuas roll Nippon Rp 250.000
128. 31/03/2024 1 pcs palu karet 75 Rp 100.000
129. 31/03/2024 1 pcs Waterpas laser level haston Rp 250.000
130. 31/03/2024 4 pcs Elastoseal Rp 100.000
131. 31/03/2024 4 kg no drop aditon 5 ltr Rp 1.200.000
132. 31/03/2024 1 pcs Lampu LED in lite 100 Watt Rp 600.000
133. 31/03/2024 Biaya langsir Granit & cat Rp 350.000
134. 31/03/2024 2 dump truk Pasir halus Rp 2.400.000
135. 31/03/2024 Biaya langsir pasir Rp 2.000.000
136. 31/03/2024 1 mata pisau granit Rp 50.000
137. 31/03/2024 20 lt bensin Genset Rp 320.000
138. 31/03/2024 Ops Lembur malam Rp 150.000
139. 03/04/2024 50 sak semen Tonasa Rp 3.500.000
140. 03/04/2024 Biaya langsir semen Rp 1.000.000
141. 06/04/2024 2 bh Lampu sorot Rp 770.000
142. 06/04/2024 2kg Cat Lenkote Rp 370.000
143. 06/04/2024 Ops genset 3 hari Rp 300.000
144. 09/04/2024 2 pcs Lampu LED in-lite 100 Watt Rp 1.300.000
145. 09/04/2024 2 pcs Lampu sorot pancaran 100 Watt Rp 800.000
146. 09/04/2024 50 m Kabel transparan besar Rp 600.000
147. 09/04/2024 11 Roll Lampu LED meteran white Rp 275.000
148. 09/04/2024 1 pcs Box MCB 4 grup dexicon Rp 80.000
149. 09/04/2024 2 pcs MCB Schneider 2,4,6,10,16,20,25A Rp 240.000
150. 09/04/2024 1 kotak klem kabel index 10mm Rp 30.000
151. 20/04/2024 7 kg Paku 7 cm Rp 245.000
152. 20/04/2024 BBM genset Rp 200.000
153. 21/04/2024 6 pcs Paku beton Uno 5" Rp 150.000
154. 21/04/2024 3 pcs Lem no cracks Rp 225.000
155. 21/04/2024 3 sak plamer curnis aplus Rp 360.000
156. 21/04/2024 10 pcs Lakban gypsum lem 30 m Rp 200.000
157. 21/04/2024 2 pak Paku gypsum Rp 100.000
158. 21/04/2024 6 pcs fitting plafon segi 8 Rp 120.000
159. 21/04/2024 8 pcs stop kontak bright Rp 240.000
160. 21/04/2024 3 box MCB 2 lubang Rp 45.000
161. 21/04/2024 30 roll Lampu LED meteran blue Rp 750.000
162. 21/04/2024 1 pcs colokan LED kecil Rp 25.000
163. 21/04/2024 8 pcs grc 6 mm Rp 1.000.000
164. 21/04/2024 Biaya langsir matrial Rp 300.000
165. 21/04/2024 3 kg Paku hitam 7cm Rp 90.000
166. 22/04/2024 12kg paku 7cm Rp 360.000
167. 26/04/2024 2 pcs kipas stand advance 18" Rp 900.000
168. 26/04/2024 1 pcs Kipas Miyako kas-1606x Rp 750.000
169. 26/04/2024 8pcs Lampu in-lite 30 Watt kapsul Rp 560.000
170. 26/04/2024 2 Roll kabel 2x50 50M Rp 300.000
171. 26/04/2024 5pcs Stop kontak bright Rp 150.000
172. 26/04/2024 4 pak Paku gypsum Rp 200.000
173. 26/04/2024 10 pcs Paku 7 cm Rp 250.000
174. 26/04/2024 6 pcs Grc 6 mm Rp 750.000
175. 26/04/2024 5 pcs Wood ECO 103 Rp 550.000
176. 28/04/2024 2pcs pipa listrik 5/8" putih Rp 30.000
177. 28/04/2024 8pcs kapi cat PVC 7" Rp 64.000
178. 28/04/2024 2pcs elbo 1/2" Rp 10.000
179. 28/04/2024 1 pak klem kabel imundex 19 Rp 70.000
180. 28/04/2024 1pcs Box MCB procyon 12 way Rp 150.000
181. 28/04/2024 6 pak Paku gypsum Rp 300.000
182. 28/04/2024 5pcs lakban gypsum lem 30m Rp 100.000
183. 28/04/2024 2pcs pipa power 1/2 AW Rp 70.000
184. 28/04/2024 13 m Amplas roll Rp 195.000
185. 28/04/2024 baki cat prima Rp 25.000
186. 28/04/2024 1 pcs kuas roll besar eterna Rp 50.000
187. 28/04/2024 kuas cat Tika " 2 1/2 Rp 44.000
188. 29/04/2024 Operasional genset Rp 200.000
189. 29/04/2024 3 kaleng cat Avian Rp 300.000
*Total Material & Biaya langsir Rp 159.597.500
✅Operasional KERJA BAKTI MINGGU 4/2/2024
✔️ Transportasi BMM (Rp 14.000x70 liter) Rp 980.000
✔️ Oli 2T (2 liter) Rp 94.000
✔️ Rokok surya satu slof Rp 375.000
✔️ Rokok sek 20 Bungkus Rp 140.000
✔️ Sirup ABC Jeruk 22 Botol Rp 380.000
✔️ Permen 20 Bungkus Rp 200.000
✔️ Gula & Kopi Rp 331.000
✔️ Snack Rp 1.200.000
*Total Ops Kerja bakti Rp 3.700.000
✅KEGIATAN SYUKURAN SANTUNAN ANAK YATIM & KAUM DUAFA
✔️ Anak Yatim (Rp 500.000x15 org) Rp 7.500.000
✔️ Janda - Janda (Rp 500.000x 20) Rp 10.000.000
✔️ Kaum Duafa (Rp 500.000x5) Rp 2.500.000
✔️ Ops acara syukuran :
- Beras 100 kilo Rp 1.500.000
- Transportasi BBM 75 liter Rp 1.050.000
- Ayam Potong (Rp 40.000x25 ekor) Rp 1.000.000
- Ikan laut (Rp 20.000x50 kg) Rp 1.000.000
- Bawang Merah 2 kg Rp 100.000
- Bawang Putih 2 kg Rp 100.000
- Cabai Kriting 2 Kg Rp 120.000
- Cabai Rawit 2 kg Rp 100.000
- Mie Sip 7 Dus Rp 450.000
- Minyak Goreng 20 Liter Rp 360.000
- Lada 1/4 Rp 50.000
- Ketumbar 1/4 Rp 50.000
- Royco 30 pcs Rp 180.000
- Tomat 8 Kg Rp 200.000
- Gula 4 kilo Rp 76.000
- Kopi 2 Bungkus Gede Rp 40.000
- Gula merah 10 buah Rp 100.000
- Kecap 4 botol besar Rp 116.000
- Micin 1 Bungkus Rp 10.000
- Garam 10 Bungkus Rp 50.000
- Tahu Rp 200.000
- Krupuk udang 5 Kilo Rp 75.000
- Air Mineral Gelas Rp 112.000
- Minyak Tanah 10 liter Rp 100.000
- Asam jawa 1 Bungkus Rp 50.000
- Tisu 4 Bungkus Rp 25.000
- Kunir 1 Kg Rp 25.000
- Jahe 1 kg Rp 25.000
- Daun Salam Rp 11.000
- Sagu 1 Karung Rp 200.000
- Pisang 2 Tandan Rp 200.000
- Singkong 1 Karung Rp 100.000
- Terong 1 Karung Rp 100.000
- Timun 1 Karung Rp 100.000
- Sabun mama lemon Rp 100.000
- Kacang Tanah 3kg Rp 130.000
- Kotak makan Dus + Mika Rp 250.000
- Sayur Pare 5 Kilo Rp 50.000
- Rokok Surya 1 Slof Rp 350.000
- Rokok Sek 10 Bungkus Rp 100.000
- Kental manis 2 Kaleng Rp 30.000
*Total Santunan & Ops syukuran Rp 29.000.000
✅RAB TUKANG & OPS.
✓Hok tukang 1 orang (Rp 130.000x40 Hari) = Rp 5.200.000
✓Hok kenek 3 orang (Rp 300.000x40 Hari) = Rp 12.000.000
Tambahan Kenek 8 orang
✓Hok Kenek 8 orang (Rp 800.000x30 Hari) = Rp 24.000.000
Konsumsi & Operasional
✓Beras untuk Tukang & Kenek 12 sak (Rp 375.000x12) = Rp 4.500.000
✓Operasional Tukang & Kenek (40 & 30 Hari) = Rp 14.000.000
*Total Hok Tukang & Ops tahap 1 Rp 59.700.000
RAB TUKANG & OPS.TAHAP 2
✓Hok tukang 1 orang (Rp 130.000x40 Hari) = Rp 5.200.000
✓Hok kenek 11 orang (Rp 1.100.000x40 Hari) = Rp 44.000.000
Konsumsi & Operasional
✓ Konsumsi Ops. Tukang & Kenek Rp 10.000.000
*Total Hok Tukang & Ops tahap 2 Rp 59.200.000
*30/03/2024 Tambahan HOK 7 Orang (5 hari) Rp 3.500.000
✅OPS. KEGIATAN MENAIKAN TIANG ALIF
Keg tgl 18 - 21 Feb 2024
• Pembelian 1 ekor sapi Rp 13.500.000
- Ops mobilisasi Sapi Rp 500.000
~Total biaya & belanja sapi Rp 14.000.000
- Ops. Genset Masjid Rp 300.000
- Ops. Belanja bahan Rp 350.000
- Ops. Ambil Kayu bakar Rp 200.000
- Ops. Ambil Bambu Rp 100.000
- Ops Cari sapi Rp 250.000
- Ops. Belanja bahan Rp 372.000
- Ops. Kirim undangan 6 Desa Rp 211.000
- Ops. Dapur ( Parut kelapa) Rp 150.000
- Ops. Belanja ikan Rp 256.000
~Total biaya Rp 2.189.000
- 5 Sak Beras (125 kg) Rp 1.875.000
- 5 Sak Tepung terigu (125 kg) Rp 1.350.000
- 1 Sak Gula pasir (50 kg) Rp 880.000
- 1 Dus Margarin Amanda (15) Rp 290.000
- Box Ragi fermipan Rp 22 000
- 3 Gandeng Susu Doncow Rp 120.000
- 1 Pak pewarna makanan Rp 25.000
- 5 Rak telur ayam Rp 315.000
- 1 Dus Kopi kapal Api 380 gram Rp 235.000
- 1 Dus kental manis Cap nona Rp 300.000
- 10 Box Teh naga Rp 80.000
- 12 kg Bawang merah Rp 650.000
- 7 kg Bawang putih Rp 350.000
- 10 Dus mie sip Rp 630.000
- 2 Pak Garam Rp 100.000
- 5 Bungkus miwon (250 gr) Rp 65.000
- 5 Pak laksa Rp 300.000
- 5 Bungkus besar kecap bango Rp 290.000
- 5 Bungkus saos tomat (1kg) Rp 115.000
- 2 Kg rica jawa Rp 300.000
- 2 Kg ketumbar Rp 120.000
- 1 Kg Kemiri Rp 60.000
- 2 Kg jinten Rp 200.000
- 2 Dos kerupuk panda Rp 240.000
- 8 Dus air mineral gelas Rp 224.000
- 20 Buah gula merah Rp 200.000
- 5 Kg kacang tanah Rp 175.000
- 40 liter Minyak goreng Rp 660.000
- 2 Asam jawa Rp 80.000
- 5 Kg Cabai Rawit Rp 165.000
- 40 kg Tomat Rp 700.000
- 13 kg Cabai keriting Rp 320.000
- 25 Kg Wortel Rp 825.000
- 10 kg Kentang Rp 350.000
- 10 kg boncis Rp 200.000
- 10 Renteng daun salam Rp 50.000
- 8 Kg Sayur kol Rp 160.000
- 2 Kg Daun bawang Rp 100.000
- 15 kg Ikan tongkol Rp 300.000
- 1 pcs Kain putih Rp 270.000
- 5 Ember Tahu Rp 600.000
- 75 liter Minyak Tanah Rp 600.000
- 1 Liter oli 2 T Rp 50.000
- 115 kg Ikan Cakalang Rp 2.530.000
- 16 kg Semangka Rp 240.000
- 3 pak Kardus Snack Rp 270.000
- 3 ikat Kresek HD 15 Rp 24.000
- 1 ikat Kresek HD 21 Rp 55.000
- 1 slop Rokok Sampoerna 16 Rp 308.000
~ Total belanja Rp 18.368.000
*Total biaya & belanja keg tiang alif Rp 34.557.000
✅Total belanja Kegiatan Syukuran masjid tgl 3/05/2024 Rp 1.725.940
===========================================
*LAPORAN per tanggal 03 mei 2024*
A.Total Donasi Masuk Rp 350.980.440
B.Total Pengeluaran Rp 350.980.440
*Saldo dana donasi* (A - B)= 0